Aggreko generate power for 2014 FIFA World Cup
17 April 2015

Industry experts create bespoke ice rink installation

Aggreko has provided a power and cooling solution to support an innovative temporary ice rink, designed to showcase the latest in ice rink design and construction to event organisers and venue operators from across the UK.

The outdoor installation included a 20 meter circular, fully operational ice rink and a 15 meter ice slide.

The structures were displayed in an ambient spring temperature of over 21°C and used the very latest power generators and temperature control solutions provided by Aggreko, to ensure they functioned in the spring sunshine.

“We are pleased to support this event which demonstrates how our services can be provided, either as a collective package or individually, to create show-stopping events,” commented George Dickson, General Manager- Events, Aggreko UK. “The event was intended as a fun day out whilst also highlighting the expertise needed to create the very best, purpose-built, ice rink installations.”

Get in touch

Image of Ice Rink at De Boer